| Health
& Safety
In an industry
that harbours a potential Health & Safety problem Vivid
Construction continually monitor methods and procedures that
reduce the risk of danger and accidents. The company regard
the promotion of Health & Safety measures as an objective
for both management, employees and subcontractors of Vivid
Construction Ltd.
In order to receive constructive
feedback about potentially dangerous occurrences or hazardous
conditions Vivid Construction Ltd adopt a proactive reporting
system that does not appoint blame, but promotes change.
Safety Management in Vivid
Construction Ltd
Introduction
We see Safety Management to be of utmost importance. Our continuing
training programme helps to ensure our personnel are competent
in their work. We always ensure the necessary resources are
available for all contracts with regards to Health and Safety,
as it is an equal part of our day to day business. This is
now available online with our customer service management
system.
Safety
Policy
A copy of the Company's Health and Safety Policy Statement
is available online.
Responsibility for Safety
The Director responsible for Health and Safety is Mr M Barclay.
Line Managers are responsible for safety throughout the organisation.
Incidents
All personnel are required to report all incidents including
near misses and those that do not result in injury. The reporting
procedure is detailed in the Safety Manual and in information
distributed throughout the company.
All incidents are investigated by managers/supervisors
and recommended action is reviewed by the Directors, Safety
Manager and at Safety Meetings. Key issues are discussed and
information is publicised as widely as possible. Where necessary,
procedures are updated, to prevent recurrence.
The following table indicates Vivid Construction
Ltd's incident records over the last 3 years.
|
|
Incident
Type |
2005 |
2006 |
2007 |
|
|
Fatal Injury Incidents |
0 |
0 |
0 |
|
|
Major Injury Incidents |
0 |
0 |
0 |
|
|
Over 3 day Incidents |
0 |
0 |
0 |
|
|
Dangerous Occurrence Incidents |
0 |
0 |
0 |
|
|
Prosecutions by HSE or Environmental
Authorities |
0 |
0 |
0 |
|
|
Prohibition Notices by HSE or Environmental
Authorities |
0 |
0 |
0 |
|
|
Improvement Notices by HSE or Environmental
Authorities |
0 |
0 |
0 |
Safety
Committee
Safety meetings are held quarterly and consider policy and
performance, reviewing any Safety Incidents, new legislation
and other relevant items.
Safety
Documentation
The company Safety Manual has been prepared and is updated
and amended as necessary. Copies are available online through
our Customer Service Management System and can be viewed at
any time. It comprises 3 Sections.
• Policy Statement
• Organisation and Personal Responsibilities
• Safety Arrangements
Each contract has a site specific and continually
evolving Site Safety File, which contains various documentation,
including the following:
• Risk Assessments
• Method Statements
• COSHH Assessments
• Manual Handling Assessments
• Vibration Assessments
Safety Inspection
Site and office inspections are carried out by The Building
Safety Group. Site inspections are usually at approximately
2/3 week intervals and Office inspections are annually. Reports
are made out to highlight good practice and areas requiring
improvement, which is then acted on as required.
COSHH
Assessments are undertaken and recorded for all materials
and processes undertaken by the company. These assessments
are produced to comply with the COSHH Regulations and are
reviewed on a continuing basis and adapted to suit individual
situations and materials.
Safety
Training
Vivid Construction Ltd undertakes extensive training of its
staff to ensure staff are competent and capable of carrying
out their duties. All operatives and managers have or are
working towards CSCS cards.
Subcontractors
Persons or companies working on behalf of Vivid Construction
Ltd are assessed for their competence prior to commencement.
Risk assessments and Method statements are required prior
to there commencement on site. These must be known and understood
by all personnel involved with their work.
Risk
Assessments
Risk Assessments are carried out for each operation/contract
Vivid Construction Ltd undertakes. These are supplemented
Method Statements when required to ensure the work is carried
out safely.
Method
Statements
Method Statements are produced to provide detailed information
to carry out tasks, some where work must be done in sequence
to ensure safety. These are written, produced and passed on
to those involved in the specific work by Line Management.
Method Statements are produced when the risk assessment dictates
or clients specifically ask.
Plant
and Equipment
All plant and equipment owned by Vivid Construction Ltd is
checked, serviced, maintained, inspected and recorded as required
by legislation (such as PUWER and LOLER) and manufacturers
recommendations, which includes PAT testing of electrical
equipment. Hired in plant and equipment is treated in the
same manner.
|